TSP Engineering are just over midway through a four year, multi-million pound contract to modify and refurbish a fleet of high integrity shielded containers and doors that will facilitate the safe transfer of waste from one of Sellafield’s legacy silos, the Magnox Swarf Storage Silo, to purpose built storage.

Earlier this year Sellafield visited TSP Engineering to obtain footage that explains and demonstrates what these packages are and how they work, how they have been highly engineered with safety in mind to do the very important job of transferring the radioactive material to new treatment and storage buildings at Sellafield.  The footage captured the importance of working with such precision, getting the specification right, the rigorous testing process and our related work on gamma gates.

TSP Engineering recognise that it’s a massively important job and we are incredibly proud to be a part of it.